How Johnson County compares · From the counties’ own budgets, line by line

Utilities (water, sewer, power, airport, port, transit): Johnson County beside counties of similar size in Wyoming

Compare with:My size, my stateMy size, nationwideMy neighborsMy whole stateThe whole nation
Show:Per residentTotal dollars

Johnson County: $308,543, 5th highest of 11. The middle of the group is $0; the middle half runs from $0 to $587,387 (10 counties with figures, 6 of them at $0).

#CountyResidentsAmountPer residentWhere it comes from
1Big Horn County, WY12,084$1.4 million$113/res.County airport $412,248 · in Utilities (water, sewer, power, airport, port, transit) · name contains “airport”
County airport (construction) $955,129 · in Utilities (water, sewer, power, airport, port, transit) · name contains “airport” (2025, actual spending, all county funds, not separate boards only)
2Weston County, WY6,866$1.1 million$164/res.County airport $47,142 · in Utilities (water, sewer, power, airport, port, transit) · name contains “airport”
County airport (equipment, land and buildings) $1.1 million · in Utilities (water, sewer, power, airport, port, transit) · name contains “airport” (2025, actual spending, all county funds, not separate boards only)
3Carbon County, WY14,250$654,831$45.95/res.County airport $97,620 · in Utilities (water, sewer, power, airport, port, transit) · name contains “airport”
County airport (construction) $557,211 · in Utilities (water, sewer, power, airport, port, transit) · name contains “airport” (2025, actual spending, all county funds, not separate boards only)
4Hot Springs County, WY4,625$385,055$83.26/res.County airport $325,395 · in Utilities (water, sewer, power, airport, port, transit) · name contains “airport”
County airport (construction) $13,660 · in Utilities (water, sewer, power, airport, port, transit) · name contains “airport”
County airport (equipment, land and buildings) $46,000 · in Utilities (water, sewer, power, airport, port, transit) · name contains “airport” (2025, actual spending, all county funds, not separate boards only)
5Johnson County, WY8,803$308,543$35.05/res.County airport $118,800 · in Utilities (water, sewer, power, airport, port, transit) · name contains “airport”
County airport (construction) $183,074 · in Utilities (water, sewer, power, airport, port, transit) · name contains “airport”
County airport (equipment, land and buildings) $6,669 · in Utilities (water, sewer, power, airport, port, transit) · name contains “airport” (2025, actual spending, all county funds, not separate boards only)
6Converse County, WY13,766$0$0.00/res.no line matched in this budget (2025, actual spending, all county funds, not separate boards only)
7Crook County, WY7,775$0$0.00/res.no line matched in this budget (2025, actual spending, all county funds, not separate boards only)
8Goshen County, WY12,635$0$0.00/res.no line matched in this budget (2025, actual spending, all county funds, not separate boards only)
9Platte County, WY8,512$0$0.00/res.no line matched in this budget (2025, actual spending, all county funds, not separate boards only)
10Sublette County, WY8,965$0$0.00/res.no line matched in this budget (2025, actual spending, all county funds, not separate boards only)
11Washakie County, WY7,662$0$0.00/res.no line matched in this budget (2025, actual spending, all county funds, not separate boards only)

Who’s in the group: Counties in the same state with between half and double its population (2024 Census estimate). If fewer than five fit, the eight closest in population. Source: Each county’s own adopted budget: Arkansas counties from their appropriation ordinances, Idaho counties from their filings with the State Controller, and the other full County Commons sites from their published budgets. Every line is matched to one shared category, by Arkansas’s standard department code where there is one, otherwise by words in its name — open any category to see each line and the rule that matched it, and download every line. Years differ (most are 2026 or fiscal 2025) and so do the jobs counties do, so read these as a guide to scale. Only counties whose budgets we’ve read can appear here; for the rest this is a dead end until their budget is read.