How Clatsop County compares · From the counties’ own budgets, line by line

Utilities (water, sewer, power, airport, port, transit): Clatsop County beside neighboring counties (within 60 miles)

Compare with:My size, my stateMy size, nationwideMy neighborsMy whole stateThe whole nation
Show:Per residentTotal dollars

Dead end: Clatsop County has no figure for this yet — its own budget hasn’t been read. Ask for it. The middle of the group is $2.2 million; the middle half runs from $1.2 million to $2.3 million (3 counties with figures).

#CountyResidentsAmountPer residentWhere it comes from
1Cowlitz County, WA113,982$2.3 million$20.36/res.Storm Drainage Utilities $212,205 · in Utilities · the state’s standard line “Storm Drainage Utilities”
Water Utilities $1.2 million · in Utilities · the state’s standard line “Water Utilities”
Sewer/Reclaimed Water Utilities $785,264 · in Utilities · the state’s standard line “Sewer/Reclaimed Water Utilities”
Airports and Ports $76,000 · in Transportation · the state’s standard line “Airports and Ports” (2025, actual spending)
2Wahkiakum County, WA4,800$2.2 million$462/res.Transits, Railroads and Other Transportation Systems $522,664 · in Transportation · the state’s standard line “Transits, Railroads and Other Transportation Systems”
Ferries and Water Taxis $1.7 million · in Transportation · the state’s standard line “Ferries and Water Taxis” (2025, actual spending)
3Pacific County, WA24,245$271,282$11.19/res.Sewer/Reclaimed Water Utilities $1,495 · in Utilities · the state’s standard line “Sewer/Reclaimed Water Utilities”
Irrigation/Reclamation Utilities $269,787 · in Utilities · the state’s standard line “Irrigation/Reclamation Utilities” (2025, actual spending)

Dead ends — 4 counties in this group with no figure yet (their own budgets haven’t been read): Columbia, Tillamook, Washington, Yamhill.

Who’s in the group: Counties whose geographic center is within 60 miles of its center, in any state (2024 Census Gazetteer). Source: Each county’s own adopted budget: Arkansas counties from their appropriation ordinances, Idaho counties from their filings with the State Controller, and the other full County Commons sites from their published budgets. Every line is matched to one shared category, by Arkansas’s standard department code where there is one, otherwise by words in its name — open any category to see each line and the rule that matched it, and download every line. Years differ (most are 2026 or fiscal 2025) and so do the jobs counties do, so read these as a guide to scale. Only counties whose budgets we’ve read can appear here; for the rest this is a dead end until their budget is read.