How Clay County compares · From the counties’ own budgets, line by line

Roads and bridges: Clay County beside neighboring counties (within 60 miles)

Compare with:My size, my stateMy size, nationwideMy neighborsMy whole stateThe whole nation
Show:Per residentTotal dollars

Clay County: $267,115, 23rd highest of 27. The middle of the group is $5.4 million; the middle half runs from $2.3 million to $7.4 million (26 counties with figures, 4 of them at $0).

#CountyResidentsAmountPer residentWhere it comes from
1Hall County, GA221,745$36.0 million$162/res.General Engineering $680,310 · in General Government · the state’s standard line “General Engineering”
Public Works Administration $30.2 million · in Public Works · the state’s standard line “Public Works Administration”
Roads, Streets, and Bridges $5.1 million · in Public Works · the state’s standard line “Roads, Streets, and Bridges” (2024, actual spending, operations and capital, including utility systems, not debt only)
2Sevier County, TN100,184$14.2 million$141/res.Litter and Trash Collection $461,715 · in Highways · the state’s standard line “Litter and Trash Collection”
Other Charges $865,734 · in Highways · the state’s standard line “Other Charges”
Administration $360,709 · in Highways · the state’s standard line “Administration”
Highway and Bridge Maintenance $8.7 million · in Highways · the state’s standard line “Highway and Bridge Maintenance”
Operation and Maintenance of Equipment $1.7 million · in Highways · the state’s standard line “Operation and Maintenance of Equipment”
Quarry Operations $174,449 · in Highways · the state’s standard line “Quarry Operations”
Traffic Control $148,089 · in Highways · the state’s standard line “Traffic Control”
Capital Outlay $1.8 million · in Highways · the state’s standard line “Capital Outlay” (2025, actual spending, governmental funds, including schools only)
3Blount County, TN142,211$14.1 million$99.13/res.Litter and Trash Collection $231,924 · in Highways · the state’s standard line “Litter and Trash Collection”
Administration $1.8 million · in Highways · the state’s standard line “Administration”
Highway and Bridge Maintenance $10.8 million · in Highways · the state’s standard line “Highway and Bridge Maintenance”
Operation and Maintenance of Equipment $1.2 million · in Highways · the state’s standard line “Operation and Maintenance of Equipment” (2025, actual spending, governmental funds, including schools only)
4Murray County, GA41,316$9.9 million$240/res.Public Works Administration $8.8 million · in Public Works · the state’s standard line “Public Works Administration”
Roads, Streets, and Bridges $1.1 million · in Public Works · the state’s standard line “Roads, Streets, and Bridges” (2024, actual spending, operations and capital, including utility systems, not debt only)
5Fannin County, GA25,854$8.6 million$332/res.Public Works Administration $8.6 million · in Public Works · the state’s standard line “Public Works Administration” (2024, actual spending, operations and capital, including utility systems, not debt only)
6Lumpkin County, GA36,016$7.8 million$217/res.Public Works Administration $217,651 · in Public Works · the state’s standard line “Public Works Administration”
Roads, Streets, and Bridges $7.6 million · in Public Works · the state’s standard line “Roads, Streets, and Bridges” (2023, actual spending, operations and capital, including utility systems, not debt only)
7Pickens County, GA36,580$7.5 million$204/res.Roads, Streets, and Bridges $7.5 million · in Public Works · the state’s standard line “Roads, Streets, and Bridges” (2023, actual spending, operations and capital, including utility systems, not debt only)
8Gilmer County, GA33,327$7.4 million$223/res.Roads, Streets, and Bridges $7.4 million · in Public Works · the state’s standard line “Roads, Streets, and Bridges” (2024, actual spending, operations and capital, including utility systems, not debt only)
9Habersham County, GA49,665$7.3 million$148/res.Public Works Administration $2.0 million · in Public Works · the state’s standard line “Public Works Administration”
Roads, Streets, and Bridges $5.4 million · in Public Works · the state’s standard line “Roads, Streets, and Bridges” (2024, actual spending, operations and capital, including utility systems, not debt only)
10Monroe County, TN49,154$7.3 million$148/res.Engineering $579,246 · in General Government · name contains “engineering”
Highway and Bridge Maintenance $3.9 million · in Highways · the state’s standard line “Highway and Bridge Maintenance”
Litter and Trash Collection $101,596 · in Highways · the state’s standard line “Litter and Trash Collection”
Administration $317,315 · in Highways · the state’s standard line “Administration”
Operation and Maintenance of Equipment $585,362 · in Highways · the state’s standard line “Operation and Maintenance of Equipment”
Other Charges $328,466 · in Highways · the state’s standard line “Other Charges”
Capital Outlay $1.5 million · in Highways · the state’s standard line “Capital Outlay” (2025, actual spending, governmental funds, including schools only)
11Rabun County, GA17,711$6.4 million$363/res.Roads, Streets, and Bridges $6.4 million · in Public Works · the state’s standard line “Roads, Streets, and Bridges” (2024, actual spending, operations and capital, including utility systems, not debt only)
12Union County, GA27,601$5.9 million$215/res.Roads, Streets, and Bridges $5.9 million · in Public Works · the state’s standard line “Roads, Streets, and Bridges” (2023, actual spending, operations and capital, including utility systems, not debt only)
13McMinn County, TN56,754$5.5 million$97.73/res.Administration $303,332 · in Highways · the state’s standard line “Administration”
Highway and Bridge Maintenance $2.8 million · in Highways · the state’s standard line “Highway and Bridge Maintenance”
Operation and Maintenance of Equipment $638,378 · in Highways · the state’s standard line “Operation and Maintenance of Equipment”
Other Charges $366,474 · in Highways · the state’s standard line “Other Charges”
Capital Outlay $1.4 million · in Highways · the state’s standard line “Capital Outlay” (2025, actual spending, governmental funds, including schools only)
14Dawson County, GA33,748$5.3 million$158/res.General Engineering $109,890 · in General Government · the state’s standard line “General Engineering”
Public Works Administration $918,703 · in Public Works · the state’s standard line “Public Works Administration”
Roads, Streets, and Bridges $4.3 million · in Public Works · the state’s standard line “Roads, Streets, and Bridges” (2024, actual spending, operations and capital, including utility systems, not debt only)
15White County, GA29,668$5.2 million$175/res.Roads, Streets, and Bridges $5.2 million · in Public Works · the state’s standard line “Roads, Streets, and Bridges” (2024, actual spending, operations and capital, including utility systems, not debt only)
16Banks County, GA20,318$3.9 million$191/res.Public Works Administration $153,667 · in Public Works · the state’s standard line “Public Works Administration”
Roads, Streets, and Bridges $3.7 million · in Public Works · the state’s standard line “Roads, Streets, and Bridges” (2024, actual spending, operations and capital, including utility systems, not debt only)
17Stephens County, GA27,498$3.4 million$125/res.Public Works Administration $2,000 · in Public Works · the state’s standard line “Public Works Administration”
Roads, Streets, and Bridges $3.4 million · in Public Works · the state’s standard line “Roads, Streets, and Bridges” (2024, actual spending, operations and capital, including utility systems, not debt only)
18Polk County, TN18,338$3.4 million$186/res.Administration $274,005 · in Highways · the state’s standard line “Administration”
Highway and Bridge Maintenance $1.3 million · in Highways · the state’s standard line “Highway and Bridge Maintenance”
Operation and Maintenance of Equipment $564,300 · in Highways · the state’s standard line “Operation and Maintenance of Equipment”
Other Charges $117,403 · in Highways · the state’s standard line “Other Charges”
Capital Outlay $1.1 million · in Highways · the state’s standard line “Capital Outlay” (2025, actual spending, governmental funds, including schools only)
19Loudon County, TN62,129$3.4 million$54.30/res.Administration $1.2 million · in Highways · the state’s standard line “Administration”
Highway and Bridge Maintenance $955,584 · in Highways · the state’s standard line “Highway and Bridge Maintenance”
Operation and Maintenance of Equipment $352,574 · in Highways · the state’s standard line “Operation and Maintenance of Equipment”
Other Charges $224,019 · in Highways · the state’s standard line “Other Charges”
Capital Outlay $602,531 · in Highways · the state’s standard line “Capital Outlay” (2025, actual spending, governmental funds, including schools only)
20Towns County, GA13,184$1.9 million$146/res.Roads, Streets, and Bridges $1.9 million · in Public Works · the state’s standard line “Roads, Streets, and Bridges” (2024, actual spending, operations and capital, including utility systems, not debt only)
21Jackson County, NC45,281$919,888$20.32/res.Streets & Highways - all other except Powell bill $919,888 · in Other · the state’s standard line “Streets & Highways - all other except Powell bill” (2025, actual spending)
22Graham County, NC8,179$734,951$89.86/res.All other transportation $734,951 · in Other · the state’s standard line “All other transportation” (2022, actual spending)
23Clay County, NC12,042$267,115$22.18/res.All other transportation $267,115 · in Other · the state’s standard line “All other transportation” (2025, actual spending)
24Haywood County, NC63,048$0$0.00/res.no line matched in this budget (2025, actual spending)
25Macon County, NC38,717$0$0.00/res.no line matched in this budget (2022, actual spending)
26Swain County, NC13,945$0$0.00/res.no line matched in this budget (2024, actual spending)
27Transylvania County, NC34,103$0$0.00/res.no line matched in this budget (2022, actual spending)

Dead ends — 4 counties in this group with no figure yet (their own budgets haven’t been read): Franklin, GA, Cherokee, Oconee, SC, Pickens, SC.

Who’s in the group: Counties whose geographic center is within 60 miles of its center, in any state (2024 Census Gazetteer). Source: Each county’s own adopted budget: Arkansas counties from their appropriation ordinances, Idaho counties from their filings with the State Controller, and the other full County Commons sites from their published budgets. Every line is matched to one shared category, by Arkansas’s standard department code where there is one, otherwise by words in its name — open any category to see each line and the rule that matched it, and download every line. Years differ (most are 2026 or fiscal 2025) and so do the jobs counties do, so read these as a guide to scale. Only counties whose budgets we’ve read can appear here; for the rest this is a dead end until their budget is read.