How Hendricks County compares · From the counties’ own budgets, line by line

Natural resources and environment: Hendricks County beside counties of similar size across the nation

Compare with:My size, my stateMy size, nationwideMy neighborsMy whole stateThe whole nation
Show:Per residentTotal dollars

Hendricks County: $0.92 per resident, 38th highest of 94. The middle of the group is $0.00; the middle half runs from $0.00 to $12.43 (93 counties with figures, 54 of them at $0).

#CountyResidentsPer residentAmountWhere it comes from
1Martin County, FL165,666$153$25.4 millionConservation and Resource Management $19.0 million · in Physical Environment · the state’s standard line “Conservation and Resource Management”
Flood Control / Stormwater Management $6.3 million · in Physical Environment · the state’s standard line “Flood Control / Stormwater Management” (2025, actual spending, governmental and business funds, including transfers only)
2Charlotte County, FL212,122$138$29.3 millionConservation and Resource Management $9.4 million · in Physical Environment · the state’s standard line “Conservation and Resource Management”
Flood Control / Stormwater Management $1.9 million · in Physical Environment · the state’s standard line “Flood Control / Stormwater Management”
Other Physical Environment $17.9 million · in Physical Environment · the state’s standard line “Other Physical Environment” (2025, actual spending, governmental and business funds, including transfers only)
3Carroll County, MD177,108$66.51$11.8 millionNatural resources $11.8 million · in Natural Resources · the state’s standard line “Natural resources” (2024, actual spending, county government, including transfers to school and other boards only)
4El Dorado County, CA192,823$63.97$12.3 millionFlood Control - Soil and Water Conservation $12.3 million · in Public Protection · the state’s standard line “Flood Control - Soil and Water Conservation” (2025, actual spending)
5Santa Rosa County, FL207,653$57.49$11.9 millionConservation and Resource Management $1.6 million · in Physical Environment · the state’s standard line “Conservation and Resource Management”
Flood Control / Stormwater Management $7.9 million · in Physical Environment · the state’s standard line “Flood Control / Stormwater Management”
Other Physical Environment $2.5 million · in Physical Environment · the state’s standard line “Other Physical Environment” (2024, actual spending, governmental and business funds, including transfers only)
6Charles County, MD174,478$54.21$9.5 millionNatural resources $9.5 million · in Natural Resources · the state’s standard line “Natural resources” (2024, actual spending, county government, including transfers to school and other boards only)
7St. Louis County, MN200,794$50.27$10.1 millionConservation of natural resources $10.0 million · in Conservation of Natural Resources · the state’s standard line “Conservation of natural resources”
Conservation of natural resources: buildings and equipment $124,435 · in Conservation of Natural Resources · the state’s standard line “Conservation of natural resources: buildings and equipment” (2024, actual spending, governmental funds, not utilities only)
8Stearns County, MN163,997$44.77$7.3 millionConservation of natural resources $7.3 million · in Conservation of Natural Resources · the state’s standard line “Conservation of natural resources” (2024, actual spending, governmental funds, not utilities only)
9Citrus County, FL170,174$31.85$5.4 millionConservation and Resource Management $3.3 million · in Physical Environment · the state’s standard line “Conservation and Resource Management”
Flood Control / Stormwater Management $1.9 million · in Physical Environment · the state’s standard line “Flood Control / Stormwater Management”
Other Physical Environment $128,291 · in Physical Environment · the state’s standard line “Other Physical Environment” (2025, actual spending, governmental and business funds, including transfers only)
10Madera County, CA165,432$31.30$5.2 millionFlood Control - Soil and Water Conservation $5.2 million · in Public Protection · the state’s standard line “Flood Control - Soil and Water Conservation” (2025, actual spending)
11Indian River County, FL172,139$25.32$4.4 millionConservation and Resource Management $2.8 million · in Physical Environment · the state’s standard line “Conservation and Resource Management”
Flood Control / Stormwater Management $1.3 million · in Physical Environment · the state’s standard line “Flood Control / Stormwater Management”
Other Physical Environment $225,446 · in Physical Environment · the state’s standard line “Other Physical Environment” (2025, actual spending, governmental and business funds, including transfers only)
12Washington County, PA210,434$23.17$4.9 millionConservation $4.9 million · in Conservation · the state’s standard line “Conservation” (2024, actual spending, governmental funds, not transfers only)
13Scott County, MN157,206$22.92$3.6 millionConservation of natural resources $3.2 million · in Conservation of Natural Resources · the state’s standard line “Conservation of natural resources”
Conservation of natural resources: buildings and equipment $421,299 · in Conservation of Natural Resources · the state’s standard line “Conservation of natural resources: buildings and equipment” (2024, actual spending, governmental funds, not utilities only)
14Butte County, CA208,334$21.02$4.4 millionFlood Control - Soil and Water Conservation $4.4 million · in Public Protection · the state’s standard line “Flood Control - Soil and Water Conservation” (2025, actual spending)
15Washington County, MD157,228$20.36$3.2 millionNatural resources $3.2 million · in Natural Resources · the state’s standard line “Natural resources” (2024, actual spending, county government, including transfers to school and other boards only)
16Okaloosa County, FL220,483$18.97$4.2 millionConservation and Resource Management $1.5 million · in Physical Environment · the state’s standard line “Conservation and Resource Management”
Flood Control / Stormwater Management $2.7 million · in Physical Environment · the state’s standard line “Flood Control / Stormwater Management” (2024, actual spending, governmental and business funds, including transfers only)
17Wilson County, TN169,948$18.19$3.1 millionOther Agriculture and Natural Resources $3.1 million · in Agriculture and Natural Resources · name contains “natural resources” (2025, actual spending, governmental funds, including schools only)
18Wright County, MN154,593$14.64$2.3 millionConservation of natural resources $2.3 million · in Conservation of Natural Resources · the state’s standard line “Conservation of natural resources” (2024, actual spending, governmental funds, not utilities only)
19Monroe County, PA166,523$14.62$2.4 millionConservation $2.4 million · in Conservation · the state’s standard line “Conservation” (2024, actual spending, governmental funds, not transfers only)
20Kings County, CA154,913$14.12$2.2 millionFlood Control - Soil and Water Conservation $2.2 million · in Public Protection · the state’s standard line “Flood Control - Soil and Water Conservation” (2025, actual spending)
21Schenectady County, NY162,261$14.08$2.3 millionEnvironmental Health Program $975,019 · in Health · name contains “environmental”
Flood and Erosion Control $1.3 million · in Public Safety · name contains “erosion” (2024, actual spending)
22Sumter County, FL154,693$13.36$2.1 millionConservation and Resource Management $700,222 · in Physical Environment · the state’s standard line “Conservation and Resource Management”
Flood Control / Stormwater Management $1.1 million · in Physical Environment · the state’s standard line “Flood Control / Stormwater Management”
Other Physical Environment $286,023 · in Physical Environment · the state’s standard line “Other Physical Environment” (2025, actual spending, governmental and business funds, including transfers only)
23Rensselaer County, NY160,749$12.96$2.1 millionGeneral Natural Resources $66,936 · in Community Services · name contains “natural resources”
Environmental Control $141,103 · in General Government · name contains “environmental”
Environmental Health Program $1.9 million · in Health · name contains “environmental” (2024, actual spending)
24Whatcom County, WA234,954$12.43$2.9 millionSoil and Water Conservation $479,836 · in Natural and Economic Environment · the state’s standard line “Soil and Water Conservation”
Flood Control $1.7 million · in Natural and Economic Environment · the state’s standard line “Flood Control”
Pollution Control and Remediation $318,279 · in Natural and Economic Environment · the state’s standard line “Pollution Control and Remediation”
Animal Control $466,159 · in Natural and Economic Environment · the state’s standard line “Animal Control”
Other Environmental Services $114 · in Natural and Economic Environment · the state’s standard line “Other Environmental Services” (2025, actual spending)
25Olmsted County, MN166,424$11.05$1.8 millionConservation of natural resources $1.8 million · in Conservation of Natural Resources · the state’s standard line “Conservation of natural resources” (2024, actual spending, governmental funds, not utilities only)
26Niagara County, NY209,570$10.38$2.2 millionEnvironmental Health Program $2.2 million · in Health · name contains “environmental” (2024, actual spending)
27Bay County, FL199,718$10.14$2.0 millionConservation and Resource Management $504,048 · in Physical Environment · the state’s standard line “Conservation and Resource Management”
Flood Control / Stormwater Management $1.1 million · in Physical Environment · the state’s standard line “Flood Control / Stormwater Management”
Other Physical Environment $417,461 · in Physical Environment · the state’s standard line “Other Physical Environment” (2024, actual spending, governmental and business funds, including transfers only)
28Hernando County, FL218,150$10.00$2.2 millionConservation and Resource Management $1.0 million · in Physical Environment · the state’s standard line “Conservation and Resource Management”
Flood Control / Stormwater Management $1.1 million · in Physical Environment · the state’s standard line “Flood Control / Stormwater Management”
Other Physical Environment $6,129 · in Physical Environment · the state’s standard line “Other Physical Environment” (2024, actual spending, governmental and business funds, including transfers only)
29Benton County, WA218,190$4.84$1.1 millionSoil and Water Conservation $25,295 · in Natural and Economic Environment · the state’s standard line “Soil and Water Conservation”
Pollution Control and Remediation $445,588 · in Natural and Economic Environment · the state’s standard line “Pollution Control and Remediation”
Nuisance Control $120,493 · in Natural and Economic Environment · the state’s standard line “Nuisance Control”
Animal Control $465,543 · in Natural and Economic Environment · the state’s standard line “Animal Control” (2024, actual spending)
30Broome County, NY196,397$3.65$716,070Environmental Health Program $716,070 · in Health · name contains “environmental” (2024, actual spending)
31Ulster County, NY182,977$3.54$647,562Environmental Control $647,562 · in General Government · name contains “environmental” (2024, actual spending)
32Brunswick County, NC167,112$3.23$539,292Drainage & Watershed $289,521 · in Other · the state’s standard line “Drainage & Watershed”
Natural resources and environment $249,771 · in Other · the state’s standard line “Natural resources and environment” (2025, actual spending)
33Alexandria city, VA159,102$3.00$477,741Environmental Management $477,741 · in Community Development · the state’s standard line “Environmental Management” (2025, actual spending, day-to-day operations, including the school division only)
34Clay County, FL236,760$2.96$700,884Other Physical Environment $700,884 · in Physical Environment · the state’s standard line “Other Physical Environment” (2025, actual spending, governmental and business funds, including transfers only)
35Pitt County, NC180,783$2.68$484,899Drainage & Watershed $484,899 · in Other · the state’s standard line “Drainage & Watershed” (2025, actual spending)
36Alamance County, NC183,040$1.95$356,162Natural resources and environment $356,162 · in Other · the state’s standard line “Natural resources and environment” (2025, actual spending)
37Yolo County, CA225,251$1.87$421,889Flood Control - Soil and Water Conservation $421,889 · in Public Protection · the state’s standard line “Flood Control - Soil and Water Conservation” (2025, actual spending)
38Hendricks County, IN190,629$0.92$175,000Drainage Application Fees $175,000 · in Natural resources and environment · name contains “drainage” (2026, all county funds, as adopted (before state review) only)
39Newport News city, VA183,056$0.70$128,014Environmental Management $128,014 · in Community Development · the state’s standard line “Environmental Management” (2025, actual spending, day-to-day operations, including the school division only)
40Oneida County, NY228,347$0.69$156,464Flood and Erosion Control $156,464 · in Public Safety · name contains “erosion” (2024, actual spending)
41Imperial County, CA181,724$0.00$0no line matched in this budget (2025, actual spending)
42Shasta County, CA181,121$0.00$0no line matched in this budget (2025, actual spending)
43Bibb County, GA157,056$0.00$0no line matched in this budget (2023, actual spending, operations and capital, including utility systems, not debt only)
44Columbia County, GA167,472$0.00$0no line matched in this budget (2024, actual spending, operations and capital, including utility systems, not debt only)
45Coweta County, GA158,233$0.00$0no line matched in this budget (2024, actual spending, operations and capital, including utility systems, not debt only)
46Hall County, GA221,745$0.00$0no line matched in this budget (2024, actual spending, operations and capital, including utility systems, not debt only)
47Houston County, GA174,897$0.00$0no line matched in this budget (2024, actual spending, operations and capital, including utility systems, not debt only)
48Muscogee County, GA201,830$0.00$0no line matched in this budget (2024, actual spending, operations and capital, including utility systems, not debt only)
49Paulding County, GA188,549$0.00$0no line matched in this budget (2024, actual spending, operations and capital, including utility systems, not debt only)
50Richmond County, GA206,303$0.00$0no line matched in this budget (2024, actual spending, operations and capital, including utility systems, not debt only)
51Kootenai County, ID188,323$0.00$0no line matched in this budget (2025)
52Champaign County, IL212,374$0.00$0no line matched in this budget (2024, actual spending, governmental funds and county-run businesses only)
53McLean County, IL172,069$0.00$0no line matched in this budget (2025, actual spending, governmental funds and county-run businesses only)
54Peoria County, IL179,630$0.00$0no line matched in this budget (2025, actual spending, governmental funds and county-run businesses only)
55Sangamon County, IL194,345$0.00$0no line matched in this budget (2025, actual spending, governmental funds and county-run businesses only)
56Elkhart County, IN207,436$0.00$0no line matched in this budget (2026, all county funds, as adopted (before state review) only)
57Johnson County, IN170,614$0.00$0no line matched in this budget (2026, all county funds, as adopted (before state review) only)
58Porter County, IN175,860$0.00$0no line matched in this budget (2026, all county funds, as adopted (before state review) only)
59Tippecanoe County, IN191,650$0.00$0no line matched in this budget (2026, all county funds, as adopted (before state review) only)
60Vanderburgh County, IN180,387$0.00$0no line matched in this budget (2026, all county funds, as adopted (before state review) only)
61Johnson County, IA160,080$0.00$0no line matched in this budget (2027)
62Linn County, IA231,762$0.00$0no line matched in this budget (2027)
63Scott County, IA175,601$0.00$0no line matched in this budget (2027)
64Shawnee County, KS177,942$0.00$0no line matched in this budget (2026, all budgeted funds, spending authority only)
65Kenton County, KY174,862$0.00$0no line matched in this budget (2024, all budgeted funds, final (amended) budget only)
66Berrien County, MI152,703$0.00$0no line matched in this budget (2025, actual spending)
67Jackson County, MI160,233$0.00$0no line matched in this budget (2025, actual spending)
68Livingston County, MI196,976$0.00$0no line matched in this budget (2025, actual spending)
69Monroe County, MI156,045$0.00$0no line matched in this budget (2025, actual spending)
70Muskegon County, MI177,428$0.00$0no line matched in this budget (2025, actual spending)
71Saginaw County, MI187,714$0.00$0no line matched in this budget (2025, actual spending)
72St. Clair County, MI160,308$0.00$0no line matched in this budget (2025, actual spending)
73Sarpy County, NE204,828$0.00$0no line matched in this budget (2026)
74Catawba County, NC167,054$0.00$0no line matched in this budget (2025, actual spending)
75Davidson County, NC177,809$0.00$0no line matched in this budget (2025, actual spending)
76Iredell County, NC206,361$0.00$0no line matched in this budget (2025, actual spending)
77Onslow County, NC212,954$0.00$0no line matched in this budget (2025, actual spending)
78Orange County, NC152,877$0.00$0no line matched in this budget (2025, actual spending)
79Rowan County, NC153,384$0.00$0no line matched in this budget (2025, actual spending)
80Beaver County, PA165,540$0.00$0no line matched in this budget (2024, actual spending, governmental funds, not transfers only)
81Butler County, PA199,341$0.00$0no line matched in this budget (2024, actual spending, governmental funds, not transfers only)
82Centre County, PA159,805$0.00$0no line matched in this budget (2024, actual spending, governmental funds, not transfers only)
83Franklin County, PA159,285$0.00$0no line matched in this budget (2024, actual spending, governmental funds, not transfers only)
84Lackawanna County, PA216,859$0.00$0no line matched in this budget (2024, actual spending, governmental funds, not transfers only)
85Sullivan County, TN162,703$0.00$0no line matched in this budget (2025, actual spending, governmental funds, including schools only)
86Sumner County, TN211,721$0.00$0no line matched in this budget (2025, actual spending, governmental funds, including schools only)
87Stafford County, VA168,919$0.00$0no line matched in this budget (2025, actual spending, day-to-day operations, including the school division only)
88Norfolk city, VA231,105$0.00$0no line matched in this budget (2025, actual spending, day-to-day operations, including the school division only)
89Richmond city, VA233,655$0.00$0no line matched in this budget (2025, actual spending, day-to-day operations, including the school division only)
90Kenosha County, WI168,754$0.00$0no line matched in this budget (2024, actual spending, governmental funds, including transfers only)
91Outagamie County, WI195,390$0.00$0no line matched in this budget (2024, actual spending, governmental funds, including transfers only)
92Racine County, WI198,651$0.00$0no line matched in this budget (2024, actual spending, governmental funds, including transfers only)
93Rock County, WI165,461$0.00$0no line matched in this budget (2024, actual spending, governmental funds, including transfers only)
94Winnebago County, WI173,307$0.00$0no line matched in this budget (2024, actual spending, governmental funds, including transfers only)

Dead ends — 63 counties in this group with no figure yet (their own budgets haven’t been read): Lee, AL, Montgomery, AL, Shelby, AL, Mohave, AZ, Yuma, AZ, Mesa, CO, Pueblo, CO, Lower Connecticut River Valley Planning Region, CT, Kent, DE, Hawaii, HI, Maui, HI, Wyandotte, KS, Caddo Parish, LA, Calcasieu Parish, LA, Livingston Parish, LA, Ouachita Parish, LA, Penobscot, ME, York, ME, Barnstable, MA, Hampshire, MA, DeSoto, MS, Harrison, MS, Hinds, MS, Rankin, MS, Boone, MO, Jefferson, MO, Yellowstone, MT, Merrimack, NH, Cumberland, NJ, Doña Ana, NM, Sandoval, NM, Santa Fe, NM, Cass, ND, Clermont, OH, Delaware, OH, Fairfield, OH, Greene, OH, Lake, OH, Licking, OH, Mahoning, OH, Medina, OH, Portage, OH, Trumbull, OH, Canadian, OK, Deschutes, OR, Jackson, OR, Kent, RI, Aiken, SC, Anderson, SC, Beaufort, SC, Dorchester, SC, Minnehaha, SD, Comal, TX, Ector, TX, Ellis, TX, Guadalupe, TX, Johnson, TX, Kaufman, TX, Midland, TX, Parker, TX, Washington, UT, Chittenden, VT, Kanawha, WV.

Who’s in the group: Counties anywhere in the U.S. within 25% of its population (2024 Census estimate), either way. If fewer than five fit, the eight closest in population. Source: Each county’s own adopted budget: Arkansas counties from their appropriation ordinances, Idaho counties from their filings with the State Controller, and the other full County Commons sites from their published budgets. Every line is matched to one shared category, by Arkansas’s standard department code where there is one, otherwise by words in its name — open any category to see each line and the rule that matched it, and download every line. Years differ (most are 2026 or fiscal 2025) and so do the jobs counties do, so read these as a guide to scale. Only counties whose budgets we’ve read can appear here; for the rest this is a dead end until their budget is read.