How Latah County compares · From the counties’ own budgets, line by line

Utilities (water, sewer, power, airport, port, transit): Latah County beside neighboring counties (within 60 miles)

Compare with:My size, my stateMy size, nationwideMy neighborsMy whole stateThe whole nation
Show:Per residentTotal dollars

Latah County: $0, 7th highest of 10. The middle of the group is $94,538; the middle half runs from $0 to $586,716 (9 counties with figures, 3 of them at $0).

#CountyResidentsAmountPer residentWhere it comes from
1Kootenai County, ID188,323$3.0 million$15.97/res.Airport $2.4 million · name contains “airport”
Federal Transit Authority $617,974 · name contains “transit” (2025)
2Asotin County, WA22,523$729,466$32.39/res.Storm Drainage Utilities $729,466 · in Utilities · the state’s standard line “Storm Drainage Utilities” (2025, actual spending)
3Benewah County, ID10,529$586,716$55.72/res.County Sewer Fund $305,366 · name contains “sewer”
Airport $280,850 · name contains “airport”
Benewah Co. Sewer Construction $500 · name contains “sewer” (2025)
4Nez Perce County, ID42,847$100,000$2.33/res.Airport $100,000 · name contains “airport” (2025)
5Shoshone County, ID14,074$94,538$6.72/res.Airport $94,538 · name contains “airport” (2024)
6Garfield County, WA2,404$38,321$15.94/res.Irrigation/Reclamation Utilities $38,321 · in Utilities · the state’s standard line “Irrigation/Reclamation Utilities” (2025, actual spending)
7Clearwater County, ID9,151$0$0.00/res.no line matched in this budget (2025)
8Lewis County, ID3,728$0$0.00/res.no line matched in this budget (2025)
9Whitman County, WA48,399$0$0.00/res.no line matched in this budget (2025, actual spending)
10Latah County, ID42,180$0$0.00/res.no line matched in this budget (2025)

Who’s in the group: Counties whose geographic center is within 60 miles of its center, in any state (2024 Census Gazetteer). Source: Each county’s own adopted budget: Arkansas counties from their appropriation ordinances, Idaho counties from their filings with the State Controller, and the other full County Commons sites from their published budgets. Every line is matched to one shared category, by Arkansas’s standard department code where there is one, otherwise by words in its name — open any category to see each line and the rule that matched it, and download every line. Years differ (most are 2026 or fiscal 2025) and so do the jobs counties do, so read these as a guide to scale. Only counties whose budgets we’ve read can appear here; for the rest this is a dead end until their budget is read.