How Paulding County compares · From the counties’ own budgets, line by line

Utilities (water, sewer, power, airport, port, transit): Paulding County beside neighboring counties (within 60 miles)

Compare with:My size, my stateMy size, nationwideMy neighborsMy whole stateThe whole nation
Show:Per residentTotal dollars

Paulding County: $52.0 million, 5th highest of 25. The middle of the group is $4.0 million; the middle half runs from $0 to $22.4 million (24 counties with figures, 7 of them at $0).

#CountyResidentsAmountPer residentWhere it comes from
1Gwinnett County, GA1,003,869$346.4 million$345/res.Water and Sewer System $343.6 million · in Utility systems · the state’s standard line “Water and Sewer System”
Airport $2.8 million · in Utility systems · the state’s standard line “Airport” (2024, actual spending, operations and capital, including utility systems, not debt only)
2Cobb County, GA787,538$254.7 million$323/res.Water and Sewer System $254.7 million · in Utility systems · the state’s standard line “Water and Sewer System” (2024, actual spending, operations and capital, including utility systems, not debt only)
3DeKalb County, GA770,307$196.9 million$256/res.Storm Drainage $12.9 million · in Public Works · the state’s standard line “Storm Drainage”
Wastewater $1.3 million · in Public Works · the state’s standard line “Wastewater”
Water $182.8 million · in Public Works · the state’s standard line “Water” (2023, actual spending, operations and capital, including utility systems, not debt only)
4Forsyth County, GA280,096$85.3 million$305/res.Storm Drainage $1.7 million · in Public Works · the state’s standard line “Storm Drainage”
Water $173,731 · in Public Works · the state’s standard line “Water”
Water and Sewer System $83.5 million · in Utility systems · the state’s standard line “Water and Sewer System” (2024, actual spending, operations and capital, including utility systems, not debt only)
5Paulding County, GA188,549$52.0 million$276/res.Storm Drainage $533,060 · in Public Works · the state’s standard line “Storm Drainage”
Water and Sewer System $51.5 million · in Utility systems · the state’s standard line “Water and Sewer System” (2024, actual spending, operations and capital, including utility systems, not debt only)
6Rockdale County, GA97,610$40.4 million$413/res.Water $637,225 · in Public Works · the state’s standard line “Water”
Water and Sewer System $39.7 million · in Utility systems · the state’s standard line “Water and Sewer System” (2024, actual spending, operations and capital, including utility systems, not debt only)
7Bartow County, GA117,508$29.4 million$250/res.Water and Sewer System $29.4 million · in Utility systems · the state’s standard line “Water and Sewer System” (2024, actual spending, operations and capital, including utility systems, not debt only)
8Fayette County, GA125,107$20.1 million$160/res.Storm Drainage $2.9 million · in Public Works · the state’s standard line “Storm Drainage”
Water $4.9 million · in Public Works · the state’s standard line “Water”
Water and Sewer System $12.3 million · in Utility systems · the state’s standard line “Water and Sewer System” (2024, actual spending, operations and capital, including utility systems, not debt only)
9Floyd County, GA101,390$14.1 million$139/res.Storm Drainage $147,571 · in Public Works · the state’s standard line “Storm Drainage”
Water $6.0 million · in Public Works · the state’s standard line “Water”
Water and Sewer System $6.1 million · in Utility systems · the state’s standard line “Water and Sewer System”
Airport $1.8 million · in Utility systems · the state’s standard line “Airport” (2023, actual spending, operations and capital, including utility systems, not debt only)
10Spalding County, GA70,292$9.5 million$135/res.Storm Drainage $150,169 · in Public Works · the state’s standard line “Storm Drainage”
Water and Sewer System $9.3 million · in Utility systems · the state’s standard line “Water and Sewer System” (2024, actual spending, operations and capital, including utility systems, not debt only)
11Henry County, GA259,315$9.4 million$36.44/res.Wastewater $4.1 million · in Public Works · the state’s standard line “Wastewater”
Water and Sewer System $3.6 million · in Utility systems · the state’s standard line “Water and Sewer System”
Airport $1.8 million · in Utility systems · the state’s standard line “Airport” (2024, actual spending, operations and capital, including utility systems, not debt only)
12Cherokee County, GA293,513$4.4 million$14.93/res.Storm Drainage $4.4 million · in Public Works · the state’s standard line “Storm Drainage” (2024, actual spending, operations and capital, including utility systems, not debt only)
13Pickens County, GA36,580$4.0 million$110/res.Water and Sewer System $3.0 million · in Utility systems · the state’s standard line “Water and Sewer System”
Airport $1.1 million · in Utility systems · the state’s standard line “Airport” (2023, actual spending, operations and capital, including utility systems, not debt only)
14Carroll County, GA129,911$4.0 million$30.52/res.Water $4.0 million · in Public Works · the state’s standard line “Water” (2024, actual spending, operations and capital, including utility systems, not debt only)
15Coweta County, GA158,233$2.9 million$18.23/res.Storm Drainage $305,828 · in Public Works · the state’s standard line “Storm Drainage”
Airport $2.6 million · in Utility systems · the state’s standard line “Airport” (2024, actual spending, operations and capital, including utility systems, not debt only)
16Chattooga County, GA25,306$1.6 million$63.73/res.Water and Sewer System $1.6 million · in Utility systems · the state’s standard line “Water and Sewer System” (2024, actual spending, operations and capital, including utility systems, not debt only)
17Clayton County, GA297,703$741,479$2.49/res.Cable Television $741,479 · in Public Works · the state’s standard line “Cable Television” (2024, actual spending, operations and capital, including utility systems, not debt only)
18Haralson County, GA32,404$12$0.00/res.Water $12 · in Public Works · the state’s standard line “Water” (2024, actual spending, operations and capital, including utility systems, not debt only)
19Dawson County, GA33,748$0$0.00/res.no line matched in this budget (2024, actual spending, operations and capital, including utility systems, not debt only)
20Douglas County, GA151,887$0$0.00/res.no line matched in this budget (2024, actual spending, operations and capital, including utility systems, not debt only)
21Fulton County, GA1,090,354$0$0.00/res.no line matched in this budget (2026, general fund only)
22Gilmer County, GA33,327$0$0.00/res.no line matched in this budget (2024, actual spending, operations and capital, including utility systems, not debt only)
23Gordon County, GA60,765$0$0.00/res.no line matched in this budget (2024, actual spending, operations and capital, including utility systems, not debt only)
24Heard County, GA12,119$0$0.00/res.no line matched in this budget (2024, actual spending, operations and capital, including utility systems, not debt only)
25Polk County, GA44,610$0$0.00/res.no line matched in this budget (2024, actual spending, operations and capital, including utility systems, not debt only)

Dead ends — 4 counties in this group with no figure yet (their own budgets haven’t been read): Calhoun, AL, Cherokee, AL, Cleburne, AL, Randolph, AL.

Who’s in the group: Counties whose geographic center is within 60 miles of its center, in any state (2024 Census Gazetteer). Source: Each county’s own adopted budget: Arkansas counties from their appropriation ordinances, Idaho counties from their filings with the State Controller, and the other full County Commons sites from their published budgets. Every line is matched to one shared category, by Arkansas’s standard department code where there is one, otherwise by words in its name — open any category to see each line and the rule that matched it, and download every line. Years differ (most are 2026 or fiscal 2025) and so do the jobs counties do, so read these as a guide to scale. Only counties whose budgets we’ve read can appear here; for the rest this is a dead end until their budget is read.