How McIntosh County compares · From the counties’ own budgets, line by line

Utilities (water, sewer, power, airport, port, transit): McIntosh County beside neighboring counties (within 60 miles)

Compare with:My size, my stateMy size, nationwideMy neighborsMy whole stateThe whole nation
Show:Per residentTotal dollars

McIntosh County: $1.1 million, 5th highest of 13. The middle of the group is $0; the middle half runs from $0 to $2.9 million (12 counties with figures, 7 of them at $0).

#CountyResidentsAmountPer residentWhere it comes from
1Bryan County, GA51,105$60.8 million$1,189/res.Water $55.5 million · in Public Works · the state’s standard line “Water”
Water and Sewer System $5.3 million · in Utility systems · the state’s standard line “Water and Sewer System” (2024, actual spending, operations and capital, including utility systems, not debt only)
2Glynn County, GA86,540$16.3 million$188/res.Storm Drainage $8.4 million · in Public Works · the state’s standard line “Storm Drainage”
Airport $7.9 million · in Utility systems · the state’s standard line “Airport” (2024, actual spending, operations and capital, including utility systems, not debt only)
3Chatham County, GA307,336$6.4 million$20.92/res.Storm Drainage $2.0 million · in Public Works · the state’s standard line “Storm Drainage”
Wastewater $193,769 · in Public Works · the state’s standard line “Wastewater”
Water $2.0 million · in Public Works · the state’s standard line “Water”
Water and Sewer System $2.3 million · in Utility systems · the state’s standard line “Water and Sewer System” (2024, actual spending, operations and capital, including utility systems, not debt only)
4Liberty County, GA68,607$1.7 million$24.50/res.Storm Drainage $98,176 · in Public Works · the state’s standard line “Storm Drainage”
Water $1.3 million · in Public Works · the state’s standard line “Water”
Water and Sewer System $332,273 · in Utility systems · the state’s standard line “Water and Sewer System” (2024, actual spending, operations and capital, including utility systems, not debt only)
5McIntosh County, GA11,800$1.1 million$93.13/res.Water and Sewer System $1.1 million · in Utility systems · the state’s standard line “Water and Sewer System” (2024, actual spending, operations and capital, including utility systems, not debt only)
6Pierce County, GA20,669$492,906$23.85/res.Wastewater $492,906 · in Public Works · the state’s standard line “Wastewater” (2024, actual spending, operations and capital, including utility systems, not debt only)
7Appling County, GA18,669$0$0.00/res.no line matched in this budget (2024, actual spending, operations and capital, including utility systems, not debt only)
8Brantley County, GA18,795$0$0.00/res.no line matched in this budget (2024, actual spending, operations and capital, including utility systems, not debt only)
9Camden County, GA59,099$0$0.00/res.no line matched in this budget (2024, actual spending, operations and capital, including utility systems, not debt only)
10Evans County, GA10,869$0$0.00/res.no line matched in this budget (2024, actual spending, operations and capital, including utility systems, not debt only)
11Long County, GA20,439$0$0.00/res.no line matched in this budget (2024, actual spending, operations and capital, including utility systems, not debt only)
12Tattnall County, GA24,275$0$0.00/res.no line matched in this budget (2024, actual spending, operations and capital, including utility systems, not debt only)
13Wayne County, GA32,132$0$0.00/res.no line matched in this budget (2023, actual spending, operations and capital, including utility systems, not debt only)

Who’s in the group: Counties whose geographic center is within 60 miles of its center, in any state (2024 Census Gazetteer). Source: Each county’s own adopted budget: Arkansas counties from their appropriation ordinances, Idaho counties from their filings with the State Controller, and the other full County Commons sites from their published budgets. Every line is matched to one shared category, by Arkansas’s standard department code where there is one, otherwise by words in its name — open any category to see each line and the rule that matched it, and download every line. Years differ (most are 2026 or fiscal 2025) and so do the jobs counties do, so read these as a guide to scale. Only counties whose budgets we’ve read can appear here; for the rest this is a dead end until their budget is read.