How Forsyth County compares · From the counties’ own budgets, line by line

Utilities (water, sewer, power, airport, port, transit): Forsyth County beside counties of similar size in Georgia

Compare with:My size, my stateMy size, nationwideMy neighborsMy whole stateThe whole nation
Show:Per residentTotal dollars

Forsyth County: $85.3 million, 2nd highest of 14. The middle of the group is $6.5 million; the middle half runs from $4.4 million to $14.2 million (13 counties with figures, 1 of them at $0).

#CountyResidentsAmountPer residentWhere it comes from
1Richmond County, GA206,303$114.7 million$556/res.Storm Drainage $2.3 million · in Public Works · the state’s standard line “Storm Drainage”
Wastewater $9,383 · in Public Works · the state’s standard line “Wastewater”
Water and Sewer System $92.2 million · in Utility systems · the state’s standard line “Water and Sewer System”
Airport $20.1 million · in Utility systems · the state’s standard line “Airport” (2024, actual spending, operations and capital, including utility systems, not debt only)
2Forsyth County, GA280,096$85.3 million$305/res.Storm Drainage $1.7 million · in Public Works · the state’s standard line “Storm Drainage”
Water $173,731 · in Public Works · the state’s standard line “Water”
Water and Sewer System $83.5 million · in Utility systems · the state’s standard line “Water and Sewer System” (2024, actual spending, operations and capital, including utility systems, not debt only)
3Paulding County, GA188,549$52.0 million$276/res.Storm Drainage $533,060 · in Public Works · the state’s standard line “Storm Drainage”
Water and Sewer System $51.5 million · in Utility systems · the state’s standard line “Water and Sewer System” (2024, actual spending, operations and capital, including utility systems, not debt only)
4Columbia County, GA167,472$26.8 million$160/res.Water and Sewer System $26.8 million · in Utility systems · the state’s standard line “Water and Sewer System” (2024, actual spending, operations and capital, including utility systems, not debt only)
5Houston County, GA174,897$14.2 million$81.17/res.Storm Drainage $1.5 million · in Public Works · the state’s standard line “Storm Drainage”
Wastewater $43,490 · in Public Works · the state’s standard line “Wastewater”
Water $2.8 million · in Public Works · the state’s standard line “Water”
Water and Sewer System $9.8 million · in Utility systems · the state’s standard line “Water and Sewer System” (2024, actual spending, operations and capital, including utility systems, not debt only)
6Muscogee County, GA201,830$11.4 million$56.56/res.Storm Drainage $10.1 million · in Public Works · the state’s standard line “Storm Drainage”
Telecommunications (Broadband) $1.3 million · in Public Works · the state’s standard line “Telecommunications (Broadband)” (2024, actual spending, operations and capital, including utility systems, not debt only)
7Henry County, GA259,315$9.4 million$36.44/res.Wastewater $4.1 million · in Public Works · the state’s standard line “Wastewater”
Water and Sewer System $3.6 million · in Utility systems · the state’s standard line “Water and Sewer System”
Airport $1.8 million · in Utility systems · the state’s standard line “Airport” (2024, actual spending, operations and capital, including utility systems, not debt only)
8Hall County, GA221,745$6.5 million$29.25/res.Wastewater $5,500 · in Public Works · the state’s standard line “Wastewater”
Water and Sewer System $6.5 million · in Utility systems · the state’s standard line “Water and Sewer System” (2024, actual spending, operations and capital, including utility systems, not debt only)
9Chatham County, GA307,336$6.4 million$20.92/res.Storm Drainage $2.0 million · in Public Works · the state’s standard line “Storm Drainage”
Wastewater $193,769 · in Public Works · the state’s standard line “Wastewater”
Water $2.0 million · in Public Works · the state’s standard line “Water”
Water and Sewer System $2.3 million · in Utility systems · the state’s standard line “Water and Sewer System” (2024, actual spending, operations and capital, including utility systems, not debt only)
10Bibb County, GA157,056$5.6 million$35.49/res.Storm Drainage $2.7 million · in Public Works · the state’s standard line “Storm Drainage”
Airport $2.9 million · in Utility systems · the state’s standard line “Airport” (2023, actual spending, operations and capital, including utility systems, not debt only)
11Cherokee County, GA293,513$4.4 million$14.93/res.Storm Drainage $4.4 million · in Public Works · the state’s standard line “Storm Drainage” (2024, actual spending, operations and capital, including utility systems, not debt only)
12Coweta County, GA158,233$2.9 million$18.23/res.Storm Drainage $305,828 · in Public Works · the state’s standard line “Storm Drainage”
Airport $2.6 million · in Utility systems · the state’s standard line “Airport” (2024, actual spending, operations and capital, including utility systems, not debt only)
13Clayton County, GA297,703$741,479$2.49/res.Cable Television $741,479 · in Public Works · the state’s standard line “Cable Television” (2024, actual spending, operations and capital, including utility systems, not debt only)
14Douglas County, GA151,887$0$0.00/res.no line matched in this budget (2024, actual spending, operations and capital, including utility systems, not debt only)

Who’s in the group: Counties in the same state with between half and double its population (2024 Census estimate). If fewer than five fit, the eight closest in population. Source: Each county’s own adopted budget: Arkansas counties from their appropriation ordinances, Idaho counties from their filings with the State Controller, and the other full County Commons sites from their published budgets. Every line is matched to one shared category, by Arkansas’s standard department code where there is one, otherwise by words in its name — open any category to see each line and the rule that matched it, and download every line. Years differ (most are 2026 or fiscal 2025) and so do the jobs counties do, so read these as a guide to scale. Only counties whose budgets we’ve read can appear here; for the rest this is a dead end until their budget is read.