How Houston County compares · From the counties’ own budgets, line by line

Roads and bridges: Houston County beside counties of similar size across the nation

Compare with:My size, my stateMy size, nationwideMy neighborsMy whole stateThe whole nation
Show:Per residentTotal dollars

Dead end: Houston County has no figure for this yet — its own budget hasn’t been read. Ask for it. The middle of the group is $116; the middle half runs from $64.91 to $179 (115 counties with figures, 16 of them at $0).

#CountyResidentsPer residentAmountWhere it comes from
1Carver County, MN112,628$636$71.7 millionAdministration $1.4 million · in Streets and Highways · the state’s standard line “Administration”
Maintenance $10.3 million · in Streets and Highways · the state’s standard line “Maintenance”
Engineering $3.3 million · in Streets and Highways · the state’s standard line “Engineering”
Construction $56.7 million · in Streets and Highways · the state’s standard line “Construction” (2024, actual spending, governmental funds, not utilities only)
2Nassau County, FL104,376$504$52.6 millionRoad and Street Facilities $51.4 million · in Transportation · the state’s standard line “Road and Street Facilities”
Other Transportation Systems / Services $1.2 million · in Transportation · the state’s standard line “Other Transportation Systems / Services” (2025, actual spending, governmental and business funds, including transfers only)
3Napa County, CA132,727$442$58.7 millionRoads $44.3 million · in Public Ways and Facilities, Health, and Sanitation · the state’s standard line “Roads”
Other Public Ways and Facilities $14.4 million · in Public Ways and Facilities, Health, and Sanitation · the state’s standard line “Other Public Ways and Facilities” (2025, actual spending)
4Walton County, FL89,666$425$38.1 millionRoad and Street Facilities $38.1 million · in Transportation · the state’s standard line “Road and Street Facilities” (2025, actual spending, governmental and business funds, including transfers only)
5Calvert County, MD94,913$403$38.3 millionTransportation $38.3 million · in Public Works · the state’s standard line “Transportation” (2024, actual spending, county government, including transfers to school and other boards only)
6Humboldt County, CA132,380$373$49.4 millionRoads $46.7 million · in Public Ways and Facilities, Health, and Sanitation · the state’s standard line “Roads”
Transportation Systems $2.7 million · in Public Ways and Facilities, Health, and Sanitation · the state’s standard line “Transportation Systems”
Other Public Ways and Facilities $49,599 · in Public Ways and Facilities, Health, and Sanitation · the state’s standard line “Other Public Ways and Facilities” (2025, actual spending)
7Newton County, GA124,010$363$45.1 millionPublic Works Administration $14.8 million · in Public Works · the state’s standard line “Public Works Administration”
Roads, Streets, and Bridges $30.2 million · in Public Works · the state’s standard line “Roads, Streets, and Bridges” (2024, actual spending, operations and capital, including utility systems, not debt only)
8Steuben County, NY92,015$334$30.8 millionMaintenance of Roads $13.9 million · in Transportation · name contains “roads”
Maintenance of Bridges $5.6 million · in Transportation · name contains “bridges”
Machinery $6.9 million · in Transportation · the state’s standard line “Machinery”
Snow Removal $3.1 million · in Transportation · the state’s standard line “Snow Removal”
Highway and Street Administration $934,563 · in Transportation · name contains “highway”
Engineering $381,728 · in Transportation · name contains “engineering” (2024, actual spending)
9Suffolk city, VA103,105$325$33.5 millionMaintenance of Highways, Streets, Bridges, and Sidewalks $33.5 million · in Public Works · the state’s standard line “Maintenance of Highways, Streets, Bridges, and Sidewalks” (2025, actual spending, day-to-day operations, including the school division only)
10Grand Traverse County, MI96,625$317$30.7 millionPublic Works (Non-Act 51) $9.1 million · in Public Works · the state’s standard line “Public Works (Non-Act 51)”
Road Commission/Street Dept. (Act 51) $21.5 million · in Public Works · the state’s standard line “Road Commission/Street Dept. (Act 51)” (2025, actual spending)
11Eaton County, MI109,494$312$34.2 millionPublic Works (Non-Act 51) $7.4 million · in Public Works · the state’s standard line “Public Works (Non-Act 51)”
Road Commission/Street Dept. (Act 51) $26.8 million · in Public Works · the state’s standard line “Road Commission/Street Dept. (Act 51)” (2025, actual spending)
12Garland County, AR99,902$296$29.6 millionCounty Road Fund $13.6 million · name contains “road”
County Road & Bridge Improvement $16.0 million · name contains “road” (2026)
13Sherburne County, MN103,059$287$29.6 millionAdministration $577,736 · in Streets and Highways · the state’s standard line “Administration”
Maintenance $5.8 million · in Streets and Highways · the state’s standard line “Maintenance”
Construction $21.7 million · in Streets and Highways · the state’s standard line “Construction”
All other streets and highways: buildings and equipment $1.5 million · in Streets and Highways · the state’s standard line “All other streets and highways: buildings and equipment” (2024, actual spending, governmental funds, not utilities only)
14St. Lawrence County, NY106,198$286$30.4 millionMaintenance of Roads $12.2 million · in Transportation · name contains “roads”
Maintenance of Bridges $7.1 million · in Transportation · name contains “bridges”
Snow Removal $3.8 million · in Transportation · the state’s standard line “Snow Removal”
Machinery $4.2 million · in Transportation · the state’s standard line “Machinery”
Snow Removal, State $1.9 million · in Transportation · the state’s standard line “Snow Removal, State”
Highway and Street Administration $388,645 · in Transportation · name contains “highway”
Highway Services for Other Governments $466,974 · in Transportation · name contains “highway”
Engineering $201,561 · in Transportation · name contains “engineering”
Water Transportation and Distribution $184,087 · in Utilities · name contains “transportation” (2024, actual spending)
15Mendocino County, CA89,175$275$24.5 millionRoads $24.2 million · in Public Ways and Facilities, Health, and Sanitation · the state’s standard line “Roads”
Other Public Ways and Facilities $339,143 · in Public Ways and Facilities, Health, and Sanitation · the state’s standard line “Other Public Ways and Facilities” (2025, actual spending)
16Allegan County, MI122,429$247$30.3 millionPublic Works (Non-Act 51) $14,290 · in Public Works · the state’s standard line “Public Works (Non-Act 51)”
Road Commission/Street Dept. (Act 51) $30.2 million · in Public Works · the state’s standard line “Road Commission/Street Dept. (Act 51)” (2025, actual spending)
17Bay County, MI102,651$246$25.2 millionPublic Works (Non-Act 51) $771,063 · in Public Works · the state’s standard line “Public Works (Non-Act 51)”
Road Commission/Street Dept. (Act 51) $24.4 million · in Public Works · the state’s standard line “Road Commission/Street Dept. (Act 51)” (2025, actual spending)
18St. Mary's County, MD116,469$233$27.1 millionTransportation $27.1 million · in Public Works · the state’s standard line “Transportation” (2024, actual spending, county government, including transfers to school and other boards only)
19Wicomico County, MD106,329$229$24.4 millionTransportation $24.4 million · in Public Works · the state’s standard line “Transportation” (2024, actual spending, county government, including transfers to school and other boards only)
20Bonneville County, ID133,644$222$29.7 millionRoad and Bridge $28.6 million · name contains “road”
Road Special $1.1 million · name contains “road” (2025)
21Pottawattamie County, IA93,529$220$20.6 millionRoads & Transportation $20.6 million · in Roads & Transportation · the state’s standard line “Roads & Transportation” (2027)
22Portsmouth city, VA96,482$213$20.6 millionMaintenance of Highways, Streets, Bridges, and Sidewalks $20.6 million · in Public Works · the state’s standard line “Maintenance of Highways, Streets, Bridges, and Sidewalks” (2025, actual spending, day-to-day operations, including the school division only)
23Lapeer County, MI89,168$207$18.4 millionPublic Works (Non-Act 51) $637,839 · in Public Works · the state’s standard line “Public Works (Non-Act 51)”
Road Commission/Street Dept. (Act 51) $17.8 million · in Public Works · the state’s standard line “Road Commission/Street Dept. (Act 51)” (2025, actual spending)
24Highlands County, FL109,778$197$21.7 millionRoad and Street Facilities $21.4 million · in Transportation · the state’s standard line “Road and Street Facilities”
Other Transportation Systems / Services $243,909 · in Transportation · the state’s standard line “Other Transportation Systems / Services” (2024, actual spending, governmental and business funds, including transfers only)
25Lenawee County, MI97,746$196$19.1 millionPublic Works (Non-Act 51) $190,179 · in Public Works · the state’s standard line “Public Works (Non-Act 51)”
Road Commission/Street Dept. (Act 51) $18.9 million · in Public Works · the state’s standard line “Road Commission/Street Dept. (Act 51)” (2025, actual spending)
26Dodge County, WI88,635$193$17.1 millionHighway Maintenance and Administration $7.9 million · in Transportation · the state’s standard line “Highway Maintenance and Administration”
Highway Construction $9.2 million · in Transportation · the state’s standard line “Highway Construction”
Other Transportation $30,000 · in Transportation · the state’s standard line “Other Transportation” (2024, actual spending, governmental funds, including transfers only)
27Calhoun County, MI133,785$186$24.8 millionPublic Works (Non-Act 51) $700,873 · in Public Works · the state’s standard line “Public Works (Non-Act 51)”
Road Commission/Street Dept. (Act 51) $24.1 million · in Public Works · the state’s standard line “Road Commission/Street Dept. (Act 51)” (2025, actual spending)
28Grant County, WA104,717$180$18.9 millionEngineering $3,329 · in Transportation · the state’s standard line “Engineering”
Roadway $5.8 million · in Transportation · the state’s standard line “Roadway”
Drainage $477,996 · in Transportation · the state’s standard line “Drainage”
Structures $188,857 · in Transportation · the state’s standard line “Structures”
Sidewalks $4,032 · in Transportation · the state’s standard line “Sidewalks”
Street Lighting $7,118 · in Transportation · the state’s standard line “Street Lighting”
Traffic Control Devices $1.5 million · in Transportation · the state’s standard line “Traffic Control Devices”
Snow and Ice Control $593,959 · in Transportation · the state’s standard line “Snow and Ice Control”
Street Cleaning $194,812 · in Transportation · the state’s standard line “Street Cleaning”
Roadside $975,907 · in Transportation · the state’s standard line “Roadside”
Maintenance Administration and Overhead $292,388 · in Transportation · the state’s standard line “Maintenance Administration and Overhead”
Management $294,670 · in Transportation · the state’s standard line “Management”
General Services $7.0 million · in Transportation · the state’s standard line “General Services”
Facilities $639,355 · in Transportation · the state’s standard line “Facilities”
Engineering $534,980 · in Transportation · the state’s standard line “Engineering”
Planning $355,063 · in Transportation · the state’s standard line “Planning” (2024, actual spending)
29Cecil County, MD106,305$180$19.2 millionTransportation $19.2 million · in Public Works · the state’s standard line “Transportation” (2024, actual spending, county government, including transfers to school and other boards only)
30Sheboygan County, WI118,331$177$21.0 millionHighway Maintenance and Administration $12.9 million · in Transportation · the state’s standard line “Highway Maintenance and Administration”
Highway Construction $5.7 million · in Transportation · the state’s standard line “Highway Construction”
Road-Related Facilities $357,458 · in Transportation · the state’s standard line “Road-Related Facilities”
Other Transportation $2.0 million · in Transportation · the state’s standard line “Other Transportation” (2024, actual spending, governmental funds, including transfers only)
31Skagit County, WA132,736$177$23.5 millionRoadway $5.5 million · in Transportation · the state’s standard line “Roadway”
Drainage $1.2 million · in Transportation · the state’s standard line “Drainage”
Structures $35,858 · in Transportation · the state’s standard line “Structures”
Special Purpose Paths $104,325 · in Transportation · the state’s standard line “Special Purpose Paths”
Other Traffic and Pedestrian Services $2.5 million · in Transportation · the state’s standard line “Other Traffic and Pedestrian Services”
Roadside $1.6 million · in Transportation · the state’s standard line “Roadside”
Ancillary Operations $4.7 million · in Transportation · the state’s standard line “Ancillary Operations”
Maintenance Administration and Overhead $1.9 million · in Transportation · the state’s standard line “Maintenance Administration and Overhead”
Management $2.8 million · in Transportation · the state’s standard line “Management”
General Services $421,351 · in Transportation · the state’s standard line “General Services”
Facilities $135,105 · in Transportation · the state’s standard line “Facilities”
Engineering $1.3 million · in Transportation · the state’s standard line “Engineering”
Planning $769,704 · in Transportation · the state’s standard line “Planning”
Roads/Streets Extraordinary Operations $650,537 · in Transportation · the state’s standard line “Roads/Streets Extraordinary Operations” (2025, actual spending)
32Faulkner County, AR131,611$164$21.5 millionCounty Road $12.3 million · name contains “road”
County Road Sales Tax $9.2 million · name contains “road” (2026)
33Hancock County, IN88,810$162$14.4 millionHighway $11.8 million · in Roads and bridges · name contains “highway”
Cumulative Bridge $2.1 million · in Roads and bridges · name contains “bridge”
Local Road & Street $495,000 · in Roads and bridges · name contains “road” (2026, all county funds, as adopted (before state review) only)
34Jefferson County, NY113,140$161$18.2 millionMaintenance of Bridges $5.8 million · in Transportation · name contains “bridges”
Snow Removal $3.8 million · in Transportation · the state’s standard line “Snow Removal”
Maintenance of Roads $4.5 million · in Transportation · name contains “roads”
Machinery $3.3 million · in Transportation · the state’s standard line “Machinery”
Highway and Street Administration $340,168 · in Transportation · name contains “highway”
Engineering $333,023 · in Transportation · name contains “engineering” (2024, actual spending)
35Laramie County, WY101,783$158$16.1 millionRoad and bridge $8.1 million · in Roads and bridges · name contains “road”
Road and bridge (construction) $7.7 million · in Roads and bridges · name contains “road”
Road and bridge (equipment, land and buildings) $276,159 · in Roads and bridges · name contains “road” (2025, actual spending, all county funds, not separate boards only)
36Cowlitz County, WA113,982$158$18.0 millionRoadway $6.1 million · in Transportation · the state’s standard line “Roadway”
Drainage $1.3 million · in Transportation · the state’s standard line “Drainage”
Sidewalks $1,714 · in Transportation · the state’s standard line “Sidewalks”
Street Lighting $14,970 · in Transportation · the state’s standard line “Street Lighting”
Traffic Control Devices $1.2 million · in Transportation · the state’s standard line “Traffic Control Devices”
Snow and Ice Control $294,976 · in Transportation · the state’s standard line “Snow and Ice Control”
Street Cleaning $575,025 · in Transportation · the state’s standard line “Street Cleaning”
Roadside $1.2 million · in Transportation · the state’s standard line “Roadside”
Ancillary Operations $818,671 · in Transportation · the state’s standard line “Ancillary Operations”
Maintenance Administration and Overhead $1.0 million · in Transportation · the state’s standard line “Maintenance Administration and Overhead”
Management $14,700 · in Transportation · the state’s standard line “Management”
General Services $4.1 million · in Transportation · the state’s standard line “General Services”
Facilities $292,586 · in Transportation · the state’s standard line “Facilities”
Engineering $756,017 · in Transportation · the state’s standard line “Engineering”
Planning $125,610 · in Transportation · the state’s standard line “Planning”
Roads/Streets Extraordinary Operations $138,979 · in Transportation · the state’s standard line “Roads/Streets Extraordinary Operations” (2025, actual spending)
37Fond du Lac County, WI104,269$150$15.7 millionHighway Maintenance and Administration $8.3 million · in Transportation · the state’s standard line “Highway Maintenance and Administration”
Highway Construction $6.0 million · in Transportation · the state’s standard line “Highway Construction”
Road-Related Facilities $1.4 million · in Transportation · the state’s standard line “Road-Related Facilities” (2024, actual spending, governmental funds, including transfers only)
38Bartow County, GA117,508$150$17.7 millionRoads, Streets, and Bridges $17.7 million · in Public Works · the state’s standard line “Roads, Streets, and Bridges” (2024, actual spending, operations and capital, including utility systems, not debt only)
39Dubuque County, IA99,242$147$14.6 millionRoads & Transportation $14.6 million · in Roads & Transportation · the state’s standard line “Roads & Transportation” (2027)
40Whitfield County, GA105,070$145$15.2 millionRoads, Streets, and Bridges $15.2 million · in Public Works · the state’s standard line “Roads, Streets, and Bridges” (2024, actual spending, operations and capital, including utility systems, not debt only)
41Rockdale County, GA97,610$144$14.1 millionPublic Works Administration $1.1 million · in Public Works · the state’s standard line “Public Works Administration”
Roads, Streets, and Bridges $13.0 million · in Public Works · the state’s standard line “Roads, Streets, and Bridges” (2024, actual spending, operations and capital, including utility systems, not debt only)
42Sevier County, TN100,184$141$14.2 millionLitter and Trash Collection $461,715 · in Highways · the state’s standard line “Litter and Trash Collection”
Other Charges $865,734 · in Highways · the state’s standard line “Other Charges”
Administration $360,709 · in Highways · the state’s standard line “Administration”
Highway and Bridge Maintenance $8.7 million · in Highways · the state’s standard line “Highway and Bridge Maintenance”
Operation and Maintenance of Equipment $1.7 million · in Highways · the state’s standard line “Operation and Maintenance of Equipment”
Quarry Operations $174,449 · in Highways · the state’s standard line “Quarry Operations”
Traffic Control $148,089 · in Highways · the state’s standard line “Traffic Control”
Capital Outlay $1.8 million · in Highways · the state’s standard line “Capital Outlay” (2025, actual spending, governmental funds, including schools only)
43Madison County, TN100,409$136$13.7 millionAdministration $645,356 · in Highways · the state’s standard line “Administration”
Highway and Bridge Maintenance $3.7 million · in Highways · the state’s standard line “Highway and Bridge Maintenance”
Operation and Maintenance of Equipment $465,885 · in Highways · the state’s standard line “Operation and Maintenance of Equipment”
Other Charges $189,451 · in Highways · the state’s standard line “Other Charges”
Capital Outlay $8.7 million · in Highways · the state’s standard line “Capital Outlay” (2025, actual spending, governmental funds, including schools only)
44Chautauqua County, NY124,105$135$16.8 millionEngineer $3,092 · in General Government · name contains “engineer”
Maintenance of Roads $7.1 million · in Transportation · name contains “roads”
Machinery $6.7 million · in Transportation · the state’s standard line “Machinery”
Snow Removal $2.2 million · in Transportation · the state’s standard line “Snow Removal”
Engineering $480,945 · in Transportation · name contains “engineering”
Highway and Street Administration $348,629 · in Transportation · name contains “highway” (2024, actual spending)
45Nevada County, CA102,195$135$13.8 millionRoads $13.3 million · in Public Ways and Facilities, Health, and Sanitation · the state’s standard line “Roads”
Other Public Ways and Facilities $445,521 · in Public Ways and Facilities, Health, and Sanitation · the state’s standard line “Other Public Ways and Facilities” (2025, actual spending)
46Eau Claire County, WI108,830$133$14.5 millionHighway Maintenance and Administration $7.5 million · in Transportation · the state’s standard line “Highway Maintenance and Administration”
Highway Construction $6.8 million · in Transportation · the state’s standard line “Highway Construction”
Other Transportation $105,819 · in Transportation · the state’s standard line “Other Transportation” (2024, actual spending, governmental funds, including transfers only)
47Walworth County, WI106,029$129$13.7 millionHighway Maintenance and Administration $5.4 million · in Transportation · the state’s standard line “Highway Maintenance and Administration”
Highway Construction $5.9 million · in Transportation · the state’s standard line “Highway Construction”
Other Transportation $2.4 million · in Transportation · the state’s standard line “Other Transportation” (2024, actual spending, governmental funds, including transfers only)
48Clarke County, GA129,995$124$16.2 millionPublic Works Administration $511,835 · in Public Works · the state’s standard line “Public Works Administration”
Roads, Streets, and Bridges $15.6 million · in Public Works · the state’s standard line “Roads, Streets, and Bridges” (2024, actual spending, operations and capital, including utility systems, not debt only)
49Barrow County, GA96,294$124$12.0 millionPublic Works Administration $1.7 million · in Public Works · the state’s standard line “Public Works Administration”
Roads, Streets, and Bridges $10.3 million · in Public Works · the state’s standard line “Roads, Streets, and Bridges” (2024, actual spending, operations and capital, including utility systems, not debt only)
50Hanover County, VA115,309$123$14.2 millionMaintenance of Highways, Streets, Bridges, and Sidewalks $14.2 million · in Public Works · the state’s standard line “Maintenance of Highways, Streets, Bridges, and Sidewalks” (2025, actual spending, day-to-day operations, including the school division only)
51Roanoke city, VA97,912$122$12.0 millionMaintenance of Highways, Streets, Bridges, and Sidewalks $12.0 million · in Public Works · the state’s standard line “Maintenance of Highways, Streets, Bridges, and Sidewalks” (2025, actual spending, day-to-day operations, including the school division only)
52Sutter County, CA98,545$122$12.0 millionRoads $11.7 million · in Public Ways and Facilities, Health, and Sanitation · the state’s standard line “Roads”
Transportation Terminals $18,973 · in Public Ways and Facilities, Health, and Sanitation · the state’s standard line “Transportation Terminals”
Transportation Systems $287,504 · in Public Ways and Facilities, Health, and Sanitation · the state’s standard line “Transportation Systems” (2025, actual spending)
53Putnam County, NY98,409$120$11.8 millionPublic Works Administration $696,828 · in General Government · name contains “public works”
Engineer $540,891 · in General Government · name contains “engineer”
Other Transportation $4.7 million · in Transportation · name contains “transportation”
Maintenance of Roads $2.6 million · in Transportation · name contains “roads”
Machinery $1.9 million · in Transportation · the state’s standard line “Machinery”
Snow Removal $880,541 · in Transportation · the state’s standard line “Snow Removal”
Snow Removal, State $505,050 · in Transportation · the state’s standard line “Snow Removal, State” (2024, actual spending)
54St. Croix County, WI97,954$120$11.8 millionHighway Maintenance and Administration $9.8 million · in Transportation · the state’s standard line “Highway Maintenance and Administration”
Highway Construction $2.0 million · in Transportation · the state’s standard line “Highway Construction” (2024, actual spending, governmental funds, including transfers only)
55Bastrop County, TX114,931$119$13.7 millionRoad & Bridge — Precinct 1 $2.9 million · in Road & Bridge Fund · name contains “road”
Road & Bridge — Precinct 2 $4.2 million · in Road & Bridge Fund · name contains “road”
Road & Bridge — Precinct 3 $3.4 million · in Road & Bridge Fund · name contains “road”
Road & Bridge — Precinct 4 $3.3 million · in Road & Bridge Fund · name contains “road” (2026)
56Woodbury County, IA107,257$119$12.7 millionRoads & Transportation $12.7 million · in Roads & Transportation · the state’s standard line “Roads & Transportation” (2027)
57Saline County, AR131,252$116$15.3 millionCounty Road Fund $14.3 million · name contains “road”
Additional Motor Fuel Tax Fund $1.0 million · name contains “motor fuel” (2026)
58Ozaukee County, WI93,956$116$10.9 millionHighway Maintenance and Administration $4.1 million · in Transportation · the state’s standard line “Highway Maintenance and Administration”
Highway Construction $2.2 million · in Transportation · the state’s standard line “Highway Construction”
Road-Related Facilities $956,945 · in Transportation · the state’s standard line “Road-Related Facilities”
Other Transportation $3.5 million · in Transportation · the state’s standard line “Other Transportation” (2024, actual spending, governmental funds, including transfers only)
59Fayette County, GA125,107$115$14.4 millionGeneral Engineering $217,800 · in General Government · the state’s standard line “General Engineering”
Public Works Administration $428,761 · in Public Works · the state’s standard line “Public Works Administration”
Roads, Streets, and Bridges $13.8 million · in Public Works · the state’s standard line “Roads, Streets, and Bridges” (2024, actual spending, operations and capital, including utility systems, not debt only)
60DeKalb County, IL101,335$115$11.7 millionStreets and Highways $11.7 million · in Transportation and Public Works · the state’s standard line “Streets and Highways” (2025, actual spending, governmental funds and county-run businesses only)
61Oswego County, NY118,305$113$13.4 millionSnow Removal $4.0 million · in Transportation · the state’s standard line “Snow Removal”
Maintenance of Roads $5.0 million · in Transportation · name contains “roads”
Machinery $2.9 million · in Transportation · the state’s standard line “Machinery”
Snow Removal, State $940,420 · in Transportation · the state’s standard line “Snow Removal, State”
Highway and Street Administration $331,837 · in Transportation · name contains “highway”
Engineering $193,845 · in Transportation · name contains “engineering” (2024, actual spending)
62Floyd County, GA101,390$113$11.5 millionGeneral Engineering $257,145 · in General Government · the state’s standard line “General Engineering”
Public Works Administration $7.3 million · in Public Works · the state’s standard line “Public Works Administration”
Roads, Streets, and Bridges $3.9 million · in Public Works · the state’s standard line “Roads, Streets, and Bridges” (2023, actual spending, operations and capital, including utility systems, not debt only)
63Lowndes County, GA122,082$109$13.3 millionGeneral Engineering $736,907 · in General Government · the state’s standard line “General Engineering”
Public Works Administration $667,098 · in Public Works · the state’s standard line “Public Works Administration”
Roads, Streets, and Bridges $11.9 million · in Public Works · the state’s standard line “Roads, Streets, and Bridges” (2024, actual spending, operations and capital, including utility systems, not debt only)
64Maury County, TN113,411$108$12.3 millionAdministration $306,668 · in Highways · the state’s standard line “Administration”
Highway and Bridge Maintenance $7.6 million · in Highways · the state’s standard line “Highway and Bridge Maintenance”
Operation and Maintenance of Equipment $3.4 million · in Highways · the state’s standard line “Operation and Maintenance of Equipment”
Other Charges $454,820 · in Highways · the state’s standard line “Other Charges”
Capital Outlay $608,356 · in Highways · the state’s standard line “Capital Outlay” (2025, actual spending, governmental funds, including schools only)
65LaPorte County, IN111,348$108$12.1 millionHighway $8.7 million · in Roads and bridges · name contains “highway”
Local Road & Street $1.2 million · in Roads and bridges · name contains “road”
County Major Bridge $1.1 million · in Roads and bridges · name contains “bridge”
Cumulative Bridge $1.1 million · in Roads and bridges · name contains “bridge” (2026, all county funds, as adopted (before state review) only)
66Dallas County, IA115,343$104$12.0 millionRoads & Transportation $12.0 million · in Roads & Transportation · the state’s standard line “Roads & Transportation” (2027)
67LaSalle County, IL108,390$104$11.3 millionStreets and Highways $11.3 million · in Transportation and Public Works · the state’s standard line “Streets and Highways” (2025, actual spending, governmental funds and county-run businesses only)
68Bannock County, ID91,010$103$9.4 millionRoad & Bridge $9.4 million · in Road and Bridge · name contains “road”
Engineer $0 · in Road and Bridge · name contains “engineer” (2025)
69Craighead County, AR115,852$102$11.9 millionCounty Road Department Fund $11.5 million · name contains “road”
Additional Motor Fuel Tax Fund (Act 416 of 2019) $377,000 · name contains “motor fuel” (2026)
70Vigo County, IN106,166$102$10.8 millionHighway $6.2 million · in Roads and bridges · name contains “highway”
Local Road Matching Grant / Community Crossings $2.0 million · in Roads and bridges · name contains “road”
Local Road & Street $1.3 million · in Roads and bridges · name contains “road”
Cumulative Bridge $968,700 · in Roads and bridges · name contains “bridge”
Engineering $377,005 · in Roads and bridges · name contains “engineering” (2026, all county funds, as adopted (before state review) only)
71Walton County, GA109,792$93.66$10.3 millionPublic Works Administration $521,626 · in Public Works · the state’s standard line “Public Works Administration”
Roads, Streets, and Bridges $9.8 million · in Public Works · the state’s standard line “Roads, Streets, and Bridges” (2024, actual spending, operations and capital, including utility systems, not debt only)
72Story County, IA102,498$89.76$9.2 millionRoads & Transportation $9.2 million · in Roads & Transportation · the state’s standard line “Roads & Transportation” (2027)
73Hardin County, KY112,826$89.74$10.1 millionRoad Fund $9.6 million · in Roads · the state’s standard line “Road Fund”
Local Government Economic Assistance Fund $485,622 · in Roads · the state’s standard line “Local Government Economic Assistance Fund” (2023, all budgeted funds, final (amended) budget only)
74La Crosse County, WI121,060$85.02$10.3 millionHighway Maintenance and Administration $9.5 million · in Transportation · the state’s standard line “Highway Maintenance and Administration”
Highway Construction $57,535 · in Transportation · the state’s standard line “Highway Construction”
Other Transportation $747,923 · in Transportation · the state’s standard line “Other Transportation” (2024, actual spending, governmental funds, including transfers only)
75Carroll County, GA129,911$84.71$11.0 millionRoads, Streets, and Bridges $11.0 million · in Public Works · the state’s standard line “Roads, Streets, and Bridges” (2024, actual spending, operations and capital, including utility systems, not debt only)
76Douglas County, KS121,989$84.01$10.2 millionRoad & Bridge $10.2 million · in Roads and bridges · name contains “road” (2026, all budgeted funds, spending authority only)
77Wayne County, NY90,757$82.72$7.5 millionMaintenance of Roads $3.7 million · in Transportation · name contains “roads”
Snow Removal $1.5 million · in Transportation · the state’s standard line “Snow Removal”
Machinery $1.8 million · in Transportation · the state’s standard line “Machinery”
Highway and Street Administration $277,371 · in Transportation · name contains “highway”
Engineering $209,672 · in Transportation · name contains “engineering” (2024, actual spending)
78Sebastian County, AR130,035$81.80$10.6 millionCounty Road $10.4 million · in Road Fund · name contains “road”
Add'l Motor Fuel Tax (Act 416) $241,600 · in Add'l Motor Fuel Tax (Act 416) · name contains “motor fuel” (2026)
79Madison County, IN134,222$78.00$10.5 millionHighway $5.8 million · in Roads and bridges · name contains “highway”
Cumulative Bridge $3.6 million · in Roads and bridges · name contains “bridge”
Local Road & Street $1.1 million · in Roads and bridges · name contains “road” (2026, all county funds, as adopted (before state review) only)
80Delaware County, IN112,951$77.84$8.8 millionHighway $4.8 million · in Roads and bridges · name contains “highway”
Cumulative Bridge $2.9 million · in Roads and bridges · name contains “bridge”
Local Road & Street $1.1 million · in Roads and bridges · name contains “road” (2026, all county funds, as adopted (before state review) only)
81Ontario County, NY113,012$77.80$8.8 millionPublic Works Administration $228,179 · in General Government · name contains “public works”
Maintenance of Roads $3.9 million · in Transportation · name contains “roads”
Snow Removal $1.7 million · in Transportation · the state’s standard line “Snow Removal”
Machinery $1.3 million · in Transportation · the state’s standard line “Machinery”
Engineering $885,074 · in Transportation · name contains “engineering”
Highway and Street Administration $810,076 · in Transportation · name contains “highway” (2024, actual spending)
82Albemarle County, VA117,313$76.25$8.9 millionMaintenance of Highways, Streets, Bridges, and Sidewalks $8.9 million · in Public Works · the state’s standard line “Maintenance of Highways, Streets, Bridges, and Sidewalks” (2025, actual spending, day-to-day operations, including the school division only)
83Franklin County, WA101,238$68.17$6.9 millionEngineering $43,405 · in Transportation · the state’s standard line “Engineering”
Roadway $2.5 million · in Transportation · the state’s standard line “Roadway”
Drainage $291,334 · in Transportation · the state’s standard line “Drainage”
Structures $141,449 · in Transportation · the state’s standard line “Structures”
Street Lighting $14,741 · in Transportation · the state’s standard line “Street Lighting”
Traffic Control Devices $391,092 · in Transportation · the state’s standard line “Traffic Control Devices”
Snow and Ice Control $135,357 · in Transportation · the state’s standard line “Snow and Ice Control”
Street Cleaning $177,671 · in Transportation · the state’s standard line “Street Cleaning”
Roadside $729,257 · in Transportation · the state’s standard line “Roadside”
Maintenance Administration and Overhead $603,242 · in Transportation · the state’s standard line “Maintenance Administration and Overhead”
Management $477,027 · in Transportation · the state’s standard line “Management”
General Services $714,513 · in Transportation · the state’s standard line “General Services”
Facilities $120,157 · in Transportation · the state’s standard line “Facilities”
Engineering $265,096 · in Transportation · the state’s standard line “Engineering”
Planning $151,790 · in Transportation · the state’s standard line “Planning”
Operations Administration and Overhead $110,611 · in Transportation · the state’s standard line “Operations Administration and Overhead” (2025, actual spending)
84Daviess County, KY104,457$67.83$7.1 millionRoad Fund $6.8 million · in Roads · the state’s standard line “Road Fund”
Local Government Economic Assistance Fund $271,500 · in Roads · the state’s standard line “Local Government Economic Assistance Fund” (2025, all budgeted funds, final (amended) budget only)
85Clark County, IN127,479$67.41$8.6 millionHighway $4.6 million · in Roads and bridges · name contains “highway”
Cumulative Bridge $3.4 million · in Roads and bridges · name contains “bridge”
Local Road & Street $625,000 · in Roads and bridges · name contains “road” (2026, all county funds, as adopted (before state review) only)
86Black Hawk County, IA132,348$67.25$8.9 millionRoads & Transportation $8.9 million · in Roads & Transportation · the state’s standard line “Roads & Transportation” (2027)
87Bradley County, TN113,782$62.57$7.1 millionPublic Transportation $42,000 · in Other Operations · name contains “transportation”
Administration $627,500 · in Highways · the state’s standard line “Administration”
Highway and Bridge Maintenance $2.9 million · in Highways · the state’s standard line “Highway and Bridge Maintenance”
Operation and Maintenance of Equipment $730,110 · in Highways · the state’s standard line “Operation and Maintenance of Equipment”
Traffic Control $171,527 · in Highways · the state’s standard line “Traffic Control”
Other Charges $274,242 · in Highways · the state’s standard line “Other Charges”
Capital Outlay $2.4 million · in Highways · the state’s standard line “Capital Outlay” (2025, actual spending, governmental funds, including schools only)
88Tazewell County, IL129,821$58.63$7.6 millionStreets and Highways $7.6 million · in Transportation and Public Works · the state’s standard line “Streets and Highways” (2025, actual spending, governmental funds and county-run businesses only)
89Tompkins County, NY105,602$55.21$5.8 millionMaintenance of Roads $2.7 million · in Transportation · name contains “roads”
Snow Removal $945,023 · in Transportation · the state’s standard line “Snow Removal”
Machinery $1.5 million · in Transportation · the state’s standard line “Machinery”
Transportation, Other $302,337 · in Transportation · name contains “transportation”
Highway and Street Administration $234,849 · in Transportation · name contains “highway”
Maintenance of Bridges $82,894 · in Transportation · name contains “bridges” (2024, actual spending)
90Jackson County, GA93,825$45.91$4.3 millionGeneral Engineering $390,189 · in General Government · the state’s standard line “General Engineering”
Public Works Administration $27,350 · in Public Works · the state’s standard line “Public Works Administration”
Roads, Streets, and Bridges $3.9 million · in Public Works · the state’s standard line “Roads, Streets, and Bridges” (2024, actual spending, operations and capital, including utility systems, not debt only)
91Macon County, IL100,737$39.42$4.0 millionStreets and Highways $4.0 million · in Transportation and Public Works · the state’s standard line “Streets and Highways” (2025, actual spending, governmental funds and county-run businesses only)
92Madison County, KY99,582$38.76$3.9 millionRoad Fund $3.8 million · in Roads · the state’s standard line “Road Fund”
Local Government Economic Assistance Fund $100,000 · in Roads · the state’s standard line “Local Government Economic Assistance Fund” (2024, all budgeted funds, final (amended) budget only)
93Mercer County, PA108,140$38.37$4.1 millionHighways and Streets $4.1 million · in Transportation · the state’s standard line “Highways and Streets” (2024, actual spending, governmental funds, not transfers only)
94Cambria County, PA130,108$17.11$2.2 millionHighways and Streets $2.2 million · in Transportation · the state’s standard line “Highways and Streets” (2024, actual spending, governmental funds, not transfers only)
95Henderson County, NC120,771$16.85$2.0 millionAll other transportation $2.0 million · in Other · the state’s standard line “All other transportation” (2025, actual spending)
96Rockingham County, VA87,674$9.67$848,142Maintenance of Highways, Streets, Bridges, and Sidewalks $848,142 · in Public Works · the state’s standard line “Maintenance of Highways, Streets, Bridges, and Sidewalks” (2025, actual spending, day-to-day operations, including the school division only)
97Adams County, PA107,914$4.71$507,762Highways and Streets $507,762 · in Transportation · the state’s standard line “Highways and Streets” (2024, actual spending, governmental funds, not transfers only)
98Blair County, PA120,269$4.56$547,851Highways and Streets $547,851 · in Transportation · the state’s standard line “Highways and Streets” (2024, actual spending, governmental funds, not transfers only)
99Frederick County, VA98,109$0.52$51,271Maintenance of Highways, Streets, Bridges, and Sidewalks $51,271 · in Public Works · the state’s standard line “Maintenance of Highways, Streets, Bridges, and Sidewalks” (2025, actual spending, day-to-day operations, including the school division only)
100Twin Falls County, ID96,509$0.00$0no line matched in this budget (2025)
101Kankakee County, IL106,410$0.00$0no line matched in this budget (2025, actual spending, governmental funds and county-run businesses only)
102Burke County, NC88,545$0.00$0no line matched in this budget (2025, actual spending)
103Cleveland County, NC102,194$0.00$0no line matched in this budget (2025, actual spending)
104Craven County, NC104,167$0.00$0no line matched in this budget (2025, actual spending)
105Lincoln County, NC97,611$0.00$0no line matched in this budget (2025, actual spending)
106Moore County, NC108,417$0.00$0no line matched in this budget (2025, actual spending)
107Nash County, NC97,990$0.00$0no line matched in this budget (2025, actual spending)
108Robeson County, NC118,624$0.00$0no line matched in this budget (2025, actual spending)
109Rockingham County, NC93,517$0.00$0no line matched in this budget (2025, actual spending)
110Wayne County, NC120,338$0.00$0no line matched in this budget (2025, actual spending)
111Fayette County, PA123,941$0.00$0no line matched in this budget (2024, actual spending, governmental funds, not transfers only)
112Lycoming County, PA113,236$0.00$0no line matched in this budget (2024, actual spending, governmental funds, not transfers only)
113Northumberland County, PA90,027$0.00$0no line matched in this budget (2024, actual spending, governmental funds, not transfers only)
114Montgomery County, VA98,998$0.00$0no line matched in this budget (2025, actual spending, day-to-day operations, including the school division only)
115Roanoke County, VA97,334$0.00$0no line matched in this budget (2025, actual spending, day-to-day operations, including the school division only)

Dead ends — 75 counties in this group with no figure yet (their own budgets haven’t been read): Calhoun, Cullman, Elmore, Etowah, Lauderdale, Limestone, Marshall, Morgan, St. Clair, Fairbanks North Star Borough, AK, Matanuska-Susitna Borough, AK, Cochise, AZ, Navajo, AZ, Northeastern Connecticut Planning Region, CT, Northwest Hills Planning Region, CT, Campbell, KY, Ascension Parish, LA, Bossier Parish, LA, Lafourche Parish, LA, Rapides Parish, LA, Terrebonne Parish, LA, Androscoggin, ME, Kennebec, ME, Berkshire, MA, Madison, MS, Cass, MO, Christian, MO, Franklin, MO, Jasper, MO, Platte, MO, Flathead, MT, Gallatin, MT, Missoula, MT, Grafton, NH, Strafford, NH, Cape May, NJ, Hunterdon, NJ, Warren, NJ, San Juan, NM, Burleigh, ND, Allen, OH, Ashtabula, OH, Clark, OH, Columbiana, OH, Geauga, OH, Miami, OH, Richland, OH, Tuscarawas, OH, Wayne, OH, Wood, OH, Comanche, OK, Rogers, OK, Wagoner, OK, Benton, OR, Douglas, OR, Josephine, OR, Linn, OR, Polk, OR, Yamhill, OR, Washington, RI, Lancaster, SC, Sumter, SC, Pennington, SD, Angelina, TX, Bowie, TX, Gregg, TX, Hunt, TX, Liberty, TX, Potter, TX, Tom Green, TX, Victoria, TX, Wichita, TX, Berkeley, WV, Cabell, WV, Monongalia, WV.

Who’s in the group: Counties anywhere in the U.S. within 25% of its population (2024 Census estimate), either way. If fewer than five fit, the eight closest in population. Source: Each county’s own adopted budget: Arkansas counties from their appropriation ordinances, Idaho counties from their filings with the State Controller, and the other full County Commons sites from their published budgets. Every line is matched to one shared category, by Arkansas’s standard department code where there is one, otherwise by words in its name — open any category to see each line and the rule that matched it, and download every line. Years differ (most are 2026 or fiscal 2025) and so do the jobs counties do, so read these as a guide to scale. Only counties whose budgets we’ve read can appear here; for the rest this is a dead end until their budget is read.